Notice on Grand Opening of the Main Bldg. on B1 Floor (11/16)

The General Library starts operating service on the underground area from November 16th as below.

1.Opening the Connecting Passage between the Main Bldg. and the Library Plaza

 The connecting passage between the Main Bldg. and the Library Plaza (Annex Bldg.) is opened in B1 floor. If you want to bring the book of the General Library into the Library Plaza, you should check out it at the service counter or by check-out machines in advance. You cannot bring the book from the General Library Main Bldg. without checking out.

Service Hours: From opening hours to closing hours on business days of the Main Bldg. and the Library Plaza

2.Opening the Reading Room for the Stack Materials

The Reading Room for the Stack Materials is available from November 16th. Please use the seats for reading stack materials.